Date: 01/05/2014
Location: Auckland
Project: Riverhead Reservoir
Grouting Services has now completed the stressing of the new reservoir in Riverhead for client Hawkins. The use of OVM Prestressing Systems componentry and twin 300T jacks ensured a quality job was delivered. Grouting work is underway and the grout mix design incorporates Bluey Technologies BluCem HS200A PT cable grout additive which will ensure long term performance of the prestressing steel. A job well done.
Contact Us +64 9 837 2510