Date: 31/01/2016
Location: Auckland
Project: Alexandra Park
Grouting Services engineered G-Pile system has been utilised on another project in Auckland which involved a total of 78No tension uplift piles 5m long socketed into basalt. The majority were required to achieve 1500kN under EQ over-strength action. There were some that only needed to achieve 340kN under EQ action. Grouting Services was responsible for the design, peer review and construction works. Verification loads up to 1725kN were proven.
Contact Us +64 9 837 2510