Date: 11/01/2016
Location: Auckland
Project: Alexandra Park
Reflecting a strategy of continual improvement, we are pleased to announce the arrival of our Comacchio MC-E 25R drilling mast. The drilling set up and movements can be controlled by the operator directly from the excavator cabin, using the radio remote control with great advantages in terms of efficiency and security. This photo shows the application for vertical tension piles.
Contact Us +64 9 837 2510